Probabilistic Risk Assessment

Probabilistic Risk Assessment

Probabilistic Risk Assessment

02/04/19

“How can we determine the risk of an infrastructure project?”

 

Grand infrastructure projects such as nuclear power plants, high-speed rail, and hydroelectric dams are essential for the backbone of modern human civilization. However, there if there are any faults in these systems, then the consequences could be very severe. As a result, these projects have to undergo Probabilistic Risk Assessment, which entails determining the magnitude of possible consequences and their likelihood suing quantitative analysis.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s